Running cables for commercial EV charger installations is time-consuming and expensive. Unless you’re using the Zaptec Pro.
Most EV charger manufacturers require every charger to be directly connected to the power supply. That means an installation of 6 chargers located between 30-42.5 metres from the power supply will use more than 200 metres of armoured cable!
Reduce cost, time, and emissions
Beyond the immediate cost of cable, there are also labour, time, and environmental considerations. Using the example above, installers can save ₤1,600 on cabling, ₤3,600 on labour, cut installation time in half, and reduce the CO2 footprint of the installation by 27%.
How is this possible?
Due to the innovative technology within Zaptec Pro chargers, they can be quickly and easily installed on a single cable. Yes, multiple chargers are installed on a single three-phase cable, thanks to automatic load and phase balancing.
What does it mean?
For larger projects, the benefits are immense:
- Reduced materials cost
- Reduced labour cost
- Much more efficient installation
- Reduced emissions
- Greater functionality for the customer
- Easy to scale in for future expansion
Check out this video from Zaptec partner Parklive to see how this works: