Great Yarmouth’s Herring Bridge Project

In 2023, Althon supplied a number of precast concrete headwalls, to Great Yarmouth’s Third River Crossing (Herring Bridge). All of these headwalls were made to order, and the majority of these were supplied with fitted accessories such as Kee Klamp Handrail, HDPE Non return Flap Valves, and Pond Liner Brackets at our customer’s request. One of the benefits of opting for pre fitted accessories, means there is less time spent on installation; saving valued time for contractors.

We offer an impressive range of headwalls, flow control and flood prevention products to choose from and can deliver throughout the United Kingdom on our FORS registered lorries.

Please get in touch with our sales team who would be pleased to assist you with your enquiry. Email sales(Replace this parenthesis with the @ sign)althon.co.uk or call us on 01603 488700.